Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Improvement of Chakung Khaniserbong road.
NEC/(T&C)/ APPROVAL/2005-06/22  dated  15.12.05
Approved Support from NEC: Rs 486.36 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/ SKM/2006-07/35 30.08.06 29.70 3.30
2 NEC/T/RELEASE/ SKM/2007-08/30 20.07.07 100.00 11.11
3 NEC/T/RELEASE/ SKM/2008-09/08 03.06.08 75.00 8.33
4 NEC/T/RELEASE/ SKM/2009-10/05 07.08.09 208.80 23.20
    TOTAL                                                                                    413.50 45.94
    Grand Total                                                                            459.44  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/ SKM/2009-10/05 07.08.09 232.00
TOTAL 232.00
Certified that out of Rs 459.44 lakh (Rupees Two crore twenty seven lakh forty four thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07,2007-08 & 2008-09 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 227.44 lakh (Rupees Two crore twenty seven lakh and forty four thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Earthworks   227.44
2 Widening & protective works  
3 Pavement works                                                                     
4 Drainage works  
5 Sign board  
6 Contingency  
7 Work charged  
8 Quality control  
TOTAL 227.44  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.
Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of  Rs 232.00 lakhs remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma Name:
Place: Gangtok, Sikkim. Place: Gangtok, Sikkim.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September 2009)
Name of Project : - Surface strengthening ,drainage and carpeting of Assam Pakyong road in East Sikkim.
NEC/(T&C)/ APPROVAL/2006-07/6 dated 05.06.06
Approved Support from NEC: Rs 750.76 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/19 25.08.06 63.00 7.00
2 NEC/T/RELEASE/Sikkim/2007-08/12 03.07.07 100.00 11.11
3 NEC/T/RELEASE/Sikkim/2007-08/55 12.11.07 100.00 11.11
4 NEC/T/RELEASE/Sikkim/2008-09/06 03.06.08 200.00 22.22
5 NEC/T/RELEASE/Sikkim/2008-09/105  30.03.09 100.00 11.11
    TOTAL                                                                                    563.00 62.55
    Grand Total                                                                            625.55  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09/105  30.03.09 111.11
TOTAL 111.11
Certified that out of Rs 625.55 lakh (Rupees Six crore twenty five lakh fifty five thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07, 2007-08 & 2008-09 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 578.40lakh (Rupees Five crore seventy eight lakh forty thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
  Roads      
1 Earthworks   578.40
2 Widening & protective works  
3 Pavement works  
4 Drainage works  
5 Sign board  
  Bridge  
6 Steel,abutment &decking  
7 Contingency  
8 Work charged  
9 Quality control  
10 Accomodation  
11 Agency charges  
TOTAL 578.40  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually  tilized for the purpose for which it was sanctioned.
Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
The balance of Rs 47.15 lakhs is  remaining un- utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma Name:
Place: Gangtok, Sikkim. Place: Gangtok.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September   2009)
Name of Project : - Improvement of Bermiok Legship road.
NEC/(T&C)/ APPROVAL/2005-06/6 dated 25.07.05
Approved Support from NEC: Rs 449.46 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/ SKM/2006-07/28  28.08.06 75.60 8.40
2 NEC/T/RELEASE/ SKM/2007-08/13  03.07.07 75.00 8.33
3 NEC/T/RELEASE/ SKM/2008-09/09  03.06.08 100.00 11.11
    TOTAL                                                                                    250.60 27.84
    Grand Total                                                                            278.44  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/ SKM/2008-09/09  03.06.08 111.11
TOTAL 111.11
Certified that out of Rs 278.44 lakh (Rupees Two crore  seventy eight lakh forty four thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07,2007-08 & 2008-09 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 278.44 lakh (Rupees Two crore seventy eight lakh forty four thousand only)  has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Protective works   278.44
2 Pavement works  
3 Drainage works  
4 Passing places  
5 Sign board  
6 Contingency  
7 Quality control  
TOTAL 278.44
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually  tilized for the purpose for which it was sanctioned.
Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of  Nil  remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma Name:
Place: Gangtok, Sikkim. Place: Gangtok Sikkim.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Upgradation and drainage i/c replacement of two bridges on Kimbubotey Sokpey road in south Sikkim.
NEC/(T&C)/ APPROVAL/2006-07/3 dated 05.06.06
Approved Support from NEC: Rs 1180.89 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/27  28.08.06 90.00 10.00
2 NEC/T/RELEASE/Sikkim/2007-08/20  12.07.07 100.00 11.11
3 NEC/T/RELEASE/Sikkim/2007-08/59  30.11.07 100.00 11.11
4 NEC/T/RELEASE/Sikkim/2008-09/04  03.06.08 75.00 8.33
5 NEC/T/RELEASE/Sikkim/2008-09/60  19.01.09 25.00 2.78
6 NEC/T/RELEASE/Sikkim/2009-10/06, 07.08.09 90.00 10.00
    TOTAL                                                                                    480.00 53.33
    Grand Total                                                                            533.33  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2009-10/06, 07.08.09 100.00
TOTAL 100.00
Certified that out of Rs 533.33 lakh (Rupees Five crore thirty three  lakh thirty three thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07 , 2007-08 & 2008-09 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 433.33 lakh (Rupees Four crore  thirty three lakh thirty three thousand only) has been utilized for the purpose for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Steel,abutment & decking   433.33
2 Earth works   
3 Protective works  
4 Pavement works  
5 Drainage works  
6 Contingency  
7 Work charged  
8 Quality control  
9 Accomodation  
10 Agency charges  
TOTAL 433.33
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.
Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Nil  remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary  
   
Name: G.P Sharma Name:
Place: Gangtok, Sikkim. Place: Gangtok, Sikkim.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Replacement of suspension bridge over Rabi khola river at 9th km on Melli-Phong road.
NEC/(T&C)/ APPROVAL/2005-06/21 dated 15.12.05
Approved Support from NEC: Rs 497.30 lakh
Table A             NEC
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/21          25.08.06 29.70 3.30
2 NEC/T/RELEASE/Sikkim/2008-09/45          13.10.08 100.00 11.11
3 NEC/T/RELEASE/Sikkim/2008-09/98          20.03.09 275.00 30.56
    TOTAL                                                                                    404.70 44.97
    Grand Total                                                                            449.67  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09/98          20.03.09 305.56
TOTAL 305.56
Certified that out of Rs 449.67 lakh (Rupees Four crore forty nine   lakh sixty seven thousand  only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs.343.77 lakh (Rupees Three crore forty three   lakh seventy seven thousand  only)  has been utilized for the purpose for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Bridge including abutment/deck   343.77
2 Diversion road  
3 Culvert  
4 River training works.  
5 Consultancy   
6 Contingency  
7 Work charged  
8 Quality control  
9 Accomodation  
10 Inflation  
TOTAL 343.77  
Further certified that I have satisfied myself that the conditions on which the assistance from the North Eastern Council  was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 105.90 lakhs remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma Name:
Place: Gangtok, Sikkim. Place: Gangtok, Sikkim.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September 2009)
Name of Project : - Surface strengthening ,drainage and carpeting of Sombaria Hilley road in West Sikkim.
NEC/(T&C)/ APPROVAL/2006-07/5 dated 05.06.06
Approved Support from NEC: Rs 845.68 lakh
Table A             NEC
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/26     28.08.06 85.50 9.50
2 NEC/T/RELEASE/Sikkim/2007-08/19     12.07.07 100.00 11.11
3 NEC/T/RELEASE/Sikkim/2008-09/14     03.06.08 75.00 8.33
4 NEC/T/RELEASE/Sikkim/2008-09/57     19.01.09 25.00 2.78
5 NEC/T/RELEASE/Sikkim/2008-09/104     30.03.09 200.00 22.22
    TOTAL                                                                                    485.50 53.94
    Grand Total                                                                            539.44  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09/104     30.03.09 222.22
TOTAL 222.22
Certified that out of Rs 539.44 lakh (Rupees Five crore thirty nine lakh forty four thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs. 317.22 lakh (Rupees Three crore seventeen  Lakh twenty two Thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Pavement works   317.22
2 Protection works  
3 Drainage works  
4 Sign board  
5 Contingency  
6 Work charged  
7 Quality control  
8 Accomodation  
9 Agency charges  
TOTAL 317.22
Further certified that I have satisfied myself that the conditions on which the assistance from the North Eastern Council  was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 222.22 lakhs  remains un-utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma Name:
Place: Gangtok, Sikkim. Place: Gangtok, Sikkim.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September   2009)
Name of Project : - Construction of road from 10th mile Legship-Kewzing road to Tingmoo village.
NEC/(T&C)/ APPROVAL/2004-05/38 dated 30.03.05
Approved Support from NEC: Rs 468.29 lakh
Table A             NEC
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/32  29.08.06 29.70 3.30
2 NEC/T/RELEASE/Sikkim/2007-08/23  12.07.07 50.00 5.56
3 NEC/T/RELEASE/Sikkim/2008-09/10  03.06.08 175.00 19.44
4 NEC/T/RELEASE/Sikkim/2009-10/07  07.08.09 99.00 11.00
    TOTAL                                                                                    353.70 39.30
    Grand Total                                                                            393.00  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2009-10/07  07.08.09 110.00
TOTAL 110.00
Certified that out of Rs 393 lakh (Rupees Three crore ninety three  lakh only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 207.16 lakh (Rupees Two crore seven lakh sixteen  thousand only)has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Earthworks   207.16
2 Protective works  
3 Pavement works  
4 Drainage works  
5 Sign boards  
6 Contingency  
7 Work charged  
8 Quality control  
9 Accomodation  
TOTAL 207.16  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs. 185.84 lakh  remains unutilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma Name:
Date:  Date:
Place: Gangtok, Sikkim. Place: Gangtok Sikkim.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September 2009)
Name of Project : - Construction of Makha bridge over river Tista khola at Tanak on Makha –Lingi-Yangang-Ravangla road
NEC/(T&C)/ APPROVAL/2005-06/17 dated 24.10.2005
Approved Support from NEC: Rs 495.25 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/17  25.08.06 44.55 4.95
2 NEC/T/RELEASE/Sikkim/2009-10/04  07.08.09 180.90 20.10
    TOTAL                                                                                    225.45 25.05
    Grand Total                                                                            250.50  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2009-10/04  07.08.09 201.00
TOTAL 201.00
Certified that out of Rs 250.50 lakh (Rupees Two Crore Fifty lakhs fifty  thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of  Rs 32.28 lakh (Rupees thirty two lakhs and twenty eight thousand only),has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Steel bridge   32.28
2 RCC Slab deck  
3 Earthworks  
4 Protective works  
5 Drainage works  
6 Wing wall  
7 River training works.  
8 Consultancy   
9 Contingency  
10 Work charged  
11 Quality control  
12 Accomodation  
14 Agency charges  
TOTAL 32.28  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 218.22  lakh   remains unutilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:  
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.  
Office Seal   Office Seal  
Utilisation Certificate
(Qtr ending September   2009)
Name of Project : - Upgradation and extension of Marchak Tumblabong road km 1st to 13th in East Sikkim.
NEC/(T&C)/ APPROVAL/2006-07/7 dated 05.06.2006
Approved Support from NEC: Rs 1023.00 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/17  25.08.06 99.00 11.00
2 NEC/T/RELEASE/Sikkim/2007-08/21  12.07.07 100.00 11.11
3 NEC/T/RELEASE/Sikkim/2007-08/55  12.11.07 100.00 11.11
4 NEC/T/RELEASE/Sikkim/2008-09/15  03.06.08 175.00 19.44
5 NEC/T/RELEASE/Sikkim/2008-09/56  24.12.09 25.00 2.78
6 NEC/T/RELEASE/Sikkim/2008-09/110  30.03.09 200.00 22.22
    TOTAL                                                                                    699.00 77.66
    Grand Total                                                                            776.66  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09/110  30.03.09 222.22
TOTAL 222.22
Certified that out of Rs 776.66 lakh (Rupees Seven crore  seventy six lakhs sixty six  thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07,2007-08,2008-09 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 758.31  lakhs (Rupees Seven crore fifty eight lakhs thirty one thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Earthworks   758.31
2 Widening & protective works  
3 Pavement works  
4 Drainage works  
5 Sign board  
6 Contingency  
7 Work charged  
8 Quality control  
9 Accomodation  
10 Agency charges  
TOTAL 758.31  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 18.35 lakhs remains unutilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Upgradation i/c drainage and carpeting of Ralang Phamtam road in South Sikkim
NEC/(T&C)/ APPROVAL/2006-07/4 dated 05.06.2006
Approved Support from NEC: Rs 1183.00 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2006-07/20   25.08.06 99.00 11.00
2 NEC/T/RELEASE/Sikkim/2007-08/14  03.07.07 100.00 11.11
3 NEC/T/RELEASE/Sikkim/2008-09/14  03.06.08 75.00 8.33
4 NEC/T/RELEASE/Sikkim/2009-10/03  07.08.09 122.40 13.60
    TOTAL                                                                                    396.40 44.04
    Grand Total                                                                            440.44  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2009-10/03  07.08.09 136.00
TOTAL 136.00
Certified that out of Rs 404.44 lakh (Rupees Four crore four lakh forty four thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2006-07,2007-08 & 2008-09 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 304.44 lakh (Rupees Three crore  four lakh forty four Thousand only)has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
  Road      
1 Earthworks   304.44
2 Widening & protective works  
3 Pavement works  
4 Drainage works  
5 Sign board  
  Bridges  
1 Bermali khola  
2 Chill khola  
3 Protection works  
4 Abutments  
5 Contingency  
6 Work charged  
7 Quality control  
8 Agency charges  
9 Consultancy  
TOTAL 304.44  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 100.00  remains unutilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary  
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Construction of Bridge over River Teesta on Dikchu Sankalang Mangan Road (SH: Replacement of GOUR suspension Bridge with 100 mtr span steel bridge)
NEC/(T&C)/ APPROVAL/2003-04/54 dated 27.02.2004
Approved Support from NEC: Rs 488.57  lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2004-05/9 04.08.04 90.00 10.00
2 NEC/T/RELEASE/Sikkim/2005-06/4 18.06.05 90.00 10.00
3 NEC/T/RELEASE/Sikkim/2006-07/16 25.08.06 49.50 5.50
4 NEC/T/RELEASE/Sikkim/2007-08/06 08.06.07 60.00 6.66
5 NEC/T/RELEASE/Sikkim/2008-09/13 03.06.08 75.00 8.33
6 NEC/T/RELEASE/Sikkim/2008-09/91 03.06.09 35.00 3.89
7 NEC/T/RELEASE/Sikkim/2008-09/109 03.06.09 34.98 3.89
    TOTAL                                                                                    434.48 48.27
    Grand Total                                                                            482.75  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09/109 03.06.09 38.87
TOTAL 38.87
Certified that out of Rs 482.75 lakh (Rupees Four crore Eighty two lakh seventy five thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2004-05,2005-06,2006-07 ,2007-08& 2008-09 vide letter No indicated above and Nil on account of unspent balance of previous year, sum of Rs 438.94 lakh  (Rupees four crore thirty eight lakh ninety four  thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Bridge including Abutments   438.94
2 River training works  
3 Provision for approach road  
4 Provision for sign boards  
5 Consultancy  
6 Contingency  
7 Work charged  
8 Quality control  
9 Agency charges  
TOTAL 438.94
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 43.81 lakhs remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September  2009)
(A)Name of Project : - Construction of 50 mtr span steel bridge on approach road to Khedum village.
NEC/(T&C)/ APPROVAL/2004-05/37 dated 30th March 2005
Approved Support from NEC: Rs 190.68 lakh
(B)Name of Project : - : Construction of 25 mtr span steel bridge over upper Ben khola at Ben Tarku Rabongla (GLVC)road.
NEC/(T&C)/ APPROVAL/2005-06/07 dated 25th July 2005
Approved Support from NEC: Rs 90.83 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2005-06/28 14.02.06 45.00 5.00
2 NEC/T/RELEASE/Sikkim/2006-07/25 28.08.06 59.40 6.60
3 NEC/T/RELEASE/Sikkim/2007-08/22 12.07.07 74.48 8.28
4 NEC/T/RELEASE/Sikkim/2007-08/111 30/03/09 74.48 8.28
    TOTAL                                                                                    253.36 28.16
    Grand Total                                                                            281.52  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2007-08/111 30/03/09 82.76
TOTAL 82.76
Certified that out of Rs. 281.52 lakhs (Rupees Two crore eighty one Lakh fifty two Thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2005-06, 2006-07,2007-08,2008-09 vide letter No indicated above and a balance of Nil on account of unspent balance of the previous year a sum of Rs 258.81 lakhs  (Rupees Two Crore fifty eight Lakh eighty one Thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
A Construction of bridge   258.81
  RCC Slab deck  
  Earthworks  
  Protective works  
  River training works  
B Steel parts  
  Earth work  
  RCC Slab deck  
  Abutment & Protection work  
  Drainage   
TOTAL 258.81
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 22.71 lakhs remains unutilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Date:    Date:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September 2009)
(A)Name of Project : - Construction of 40 mtr span steel bridge over lower Ben khola at Saino Taar along Pabong-Yangang road.
NEC/(T&C)/ APPROVAL/2005-06/05 dated 25th July 2005
Approved Support from NEC: Rs 137.34 lakh
(B)Name of Project : - Construction of 40 mtr span steel bridge over lower Rinzi Khola at Kholagari Namchi-Vok road.
NEC/(T&C)/ APPROVAL/2006-07/05 dated 25th July 2005
Approved Support from NEC: Rs 157.50 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2005-06/30 20.02.06 90.00 10.00
2 NEC/T/RELEASE/Sikkim/2006-07/29 29.08.06 29.70 3.30
3 NEC/T/RELEASE/Sikkim/2007-08/29 20.08.07 74.77 8.31
4 NEC/T/RELEASE/Sikkim/2007-08  17.03.09 55.00 6.11
    TOTAL                                                                                    249.47 27.72
    Grand Total                                                                            277.19  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2007-08  17.03.09 61.11
TOTAL 61.11
Certified that out of Rs 277.19 lakhs (Rupees Two crore seventy seven Lakh nineteen thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2005-06, 2006-07 ,2007-08 & 2008-09vide letter No indicated above and a balance of Nil on account of unspent balance of the previous year a sum of Rs 263.50 lakhs  (Rupees Two  crore sixty three Lakh  fifty thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
A Earth works    263.50
  Protective works  
  Pavement works  
  Drainage works  
  Sign Board  
B 40m Span Steel Bridge  
  Abutments and Protection works
     
TOTAL 263.50  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of  Rs 13.69 lakhs remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary  
   
Name: G.P Sharma Name:
Place: Gangtok, Sikkim. Place: Gangtok, Sikkim.
Office Seal Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Replacement of Ringyang suspension bridge on Soreng Sombaria Road.
NEC/(T&C)/ APPROVAL/2003-04/15 dated 06.07.2004
Approved Support from NEC: Rs 332.02 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2004-05/29   19.10.04                    (Ringyang Bridge – vide Corrigendum)     19.11.04 124.00 13.78
2 NEC/T/RELEASE/Sikkim/2005-06/18.06.05 90.00 10.00
3 NEC/T/RELEASE/Sikkim/2006-07/24 28.08.06 29.70 3.30
4 NEC/T/RELEASE/Sikkim/2007-08/43 12.09.07 55.00 6.11
    TOTAL                                                                                    298.70 33.19
    Grand Total                                                                            331.89  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2007-08/43 12.09.07 61.11
TOTAL 61.11
Certified that out of Rs 331.89 lakhs (Rupees Three Crore thirty one Lakh eighty nine thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2004-05,2005-06 , 2006-07& 2007-08 vide letter No indicated above and Nil  on account of unspent balance of previous year, sum of Rs. 331.84lakhs  (Rupees Three  Crore thirty one lakh eighty four Thousand only) has been utilized for the following works
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Bridge including abutment   331.84
2 River Training works  
3 Diversion road  
4 Approach road  
5 Sign board  
6 Consultancy  
7 Contingency  
8 Work charged  
9 Quality control  
10 Accomodation  
11 Agency charges  
TOTAL 331.84  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 0.05 lakh  remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Replacement of Sumin Wooden suspension bridge on Sang khola Sumin Road.
NEC/(T&C)/ APPROVAL/2003-04/13 dated 06.07.2004
Approved Support from NEC: Rs 285.40 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2004-05/9 04.08.04 90.00 10.00
2 NEC/T/RELEASE/Sikkim/2005-06/4 18.06.05 90.00 10.00
3 NEC/T/RELEASE/Sikkim/2006-07/30 29.08.06 29.70 3.30
4 NEC/T/RELEASE/Sikkim/2006-07/58  19/01/09 37.00 4.11
    TOTAL                                                                                    246.70 27.41
    Grand Total                                                                            274.11  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2006-07/58  19/01/09 41.11
TOTAL 41.11
Certified that out of Rs 274.11 lakhs (Rupees Two Crore seventy four Lakh eleven thousand  only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2004-05, 2005-06 and 2006-07 vide letter No indicated above and Nil  on account of unspent balance of previous year, sum of Rs 253.11 lakhs  (Rupees Two Crore fifty three eleven thousand lakh only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Bridge including abutment, Approach road etc   253.11
2 Detail survey & Investigation  
3 Sign Borads  
4 Consultancy  
5 Contingency  
6 Work charged  
7 Quality control  
8 Accomodation  
9 Agency charges  
TOTAL 253.11  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of  Rs 21.00 lakhs remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Date:    Date:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Construction and improvement of road from Turung to Suminkhor km 1st to 5th.
NEC/(T&C)/ APPROVAL/2007-08/1 dated 1st May 2007
Approved Support from NEC: Rs 358.66 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2007-08/09  50.00 5.56
2 NEC/T/RELEASE/Sikkim/2008-09/44 100.00 11.11
3 NEC/T/RELEASE/Sikkim/2008-09/90 150.00 16.67
    TOTAL                                                                                    300.00 33.340
    Grand Total                                                                            333.34  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2007-08/09  111.11
TOTAL 111.11
Certified that out of Rs 333.34 lakh  (Rupees Three Crore thirty three Lakh  thirty four thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2004-05, 2005-06 and 2006-07 vide letter No indicated above and Nil  on account of unspent balance of previous year, sum of Rs 204.62 lakh (Rupees Two crore four lakh sixty two  thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Earthworks   204.62
2 Protective works  
3 Pavement works  
4 Drainage works  
5 Work charged est.  
6 Quality control  
7 Accomodation  
8 Contingency  
9 Agency charge  
10 Agency charges  
TOTAL 204.62  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of  Rs 128.72 lakhs remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September   2009)
Name of Project : - Replacement of Takcham Chu suspension bridge on GRBA Road.
NEC/(T&C)/ APPROVAL/2003-04/14 dated 06.07.2004
Approved Support from NEC: Rs 476.76 lakh 
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2004-05/9 04.08.04 90.00 10.00
2 NEC/T/RELEASE/Sikkim/2004-05/4 18.06.05 90.00 10.00
3 NEC/T/RELEASE/Sikkim/2006-07/31 29.08.06 29.70 3.30
4 NEC/T/RELEASE/Sikkim/2007-08/15 03.07.07 60.00 6.67
5 NEC/T/RELEASE/Sikkim/2008-09/41 27.09.08 100.00 11.11
    TOTAL                                                                                    369.70 41.08
    Grand Total                                                                            410.78  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09/41 27.09.08 111.11
TOTAL 111.11
Certified that out of Rs 410.78 lakh (Rupees Four Crore ten Lakh sixty seventy eight thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2004-05,2006-07, 2007-08&2008-09 vide letter No indicated above  , sum of Rs 410.81 lakh (Rupees Four  Crore ten Lakh  eighty one thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Bridge   410.81
2 Approach road and Protective works  
3 Consultancy  
4 Contingency  
5 Work charged  
6 Quality control  
7 Miscellaneous  
8 Agency charges  
TOTAL 410.81  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Nil  remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September 2009)
Name of Project : - Strengthening Drainage and Carpetting of Sankalang Bey Sakyong to Tingvong High School road Km 1st to 7th in North District, Sikkim
NEC/(T&C)/ APPROVAL/2004-05/04 dated 5th July 2004
Approved Support from NEC: Rs 401.38 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2004-05/9 04.08.04 90.00 10.00
2 NEC/T/RELEASE/Sikkim/2005-06    18.06.05 90.00 10.00
3 NEC/T/RELEASE/Sikkim/2006-07 /22   25.08.06 29.70 3.30
4 NEC/T/RELEASE/Sikkim/2007-08 /28   20.08.07 70.77 7.86
5 NEC/T/RELEASE/Sikkim/2008-09 /12   03.06.08 50.00 5.56
    TOTAL                                                                                    330.47 36.72
    Grand Total                                                                            367.19  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09 /12   03.06.08 55.56
TOTAL 55.56
Certified that out of Rs 367.19 lakh (Rupees Three Crore sixty seven Lakh nineteen thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2004-05,2005-06, 2006-07 & 2008-09 vide letter No indicated above and a balance of Nil on account of unspent balance of the previous year a sum of Rs 367.19 lakh  (Rupees Three Crore sixty seven Lakh nineteen thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Pavement works   367.19
2 Drainage works  
3 Construction of Retaining/Breast wall  
4 Passing Places  
5 Providing Guardrail  
6 Sign/Caution board  
7 Painting/road marking  
8 Contingency  
9 Work charged  
10 Quality control  
11 Accomodation  
12 Agency charges  
TOTAL 367.19  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Nil  remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
   
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September  2009)
Name of Project : - Construction of major retaining structure on approach road to Raj Bhawan VIP complex and TNA school.
NEC/(T&C)/ APPROVAL/2005-06/07 dated 25th July 2005
Approved Support from NEC: Rs 110.58 lakh
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2005-06/41 06.03.06 45.00 5.00
2 NEC/T/RELEASE/Sikkim/2006-07/34 30.08.06 29.70 3.30
3 NEC/T/RELEASE/Sikkim/2008-09/07 30.06.07 15.00 1.67
4 NEC/T/RELEASE/Sikkim/2008-09/92 17.03.09 9.82 1.09
    TOTAL                                                                                    99.52 11.06
    Grand Total                                                                            110.58  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2008-09/92 17.03.09 10.91
TOTAL 10.91
Certified that out of Rs 110.58  lakhs(Rupees One Crore ten Lakh fifty eight thousand only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2004-05,2005-06,2006-07& 2008-09 vide letter No indicated above and a balance of Nil on account of unspent balance of the previous year a sum of Rs 109.27 lakhs (Rupees One Crore Nine Lakh twenty seven Thousand only) has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Counter fort wall   109.27
2 Concrete & Sausage wall  
3 River training works  
4 Footpath  
5 Construction of sentry post, gate & Fencing.  
6 Shifting of Public Utilities  
7 Contingency  
8 Work charged  
9 Quality control  
10 Agency charges  
TOTAL 109.27  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 1.31 lakhs   remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.
Office Seal   Office Seal
Utilisation Certificate
(Qtr ending September 2009)
Name of Project : - Survey Investigation and preparation of DPR for the 11th Plan road schemes.
NEC/(T&C)/ APPROVAL/2007-08/06 dated 8th February  2008
Approved Support from NEC: Rs 32.00 lakh
Table A             NEC
Releases made till date:
Rupees in Lakh
Sl Letter No and date Grant Amount State Loan Amount
1 NEC/T/RELEASE/Sikkim/2007-08/72  08.02.2008 28.80 3.20
    TOTAL                                                                                    28.80 3.20
    Grand Total                                                                            32.00  
Current release/releases for which the U.C is being furnished:
Rupees in Lakh
Sl Letter No and date Amount
1 NEC/T/RELEASE/Sikkim/2007-08/72  08.02.2008 32.00
TOTAL 32.00
Certified that out of Rs 32.00 lakhs  (Rupees Thirty two lakhs only) made available as assistance under NEC sanction by the North Eastern Council, Shillong during the financial year 2007-08  vide letter No indicated above and a balance of Nil on account of unspent balance of the previous year a sum of Rs 25.50 lakhs has been utilized for the following works:
Rupees in Lakh
Sl Components/items of works Amount utilized
1 Sang khola Zingla   14.50  
2 simchuthang Nanpol Yangang   11.00  
3 Sang khola Sumin   0.00  
TOTAL 25.50  
Further certified that I have satisfied myself that the conditions on which the assistance from NEC was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilised for the purpose for which it was sanctioned.

Kinds of checks exercised*:
Vouchers and Book of Accounts
Measurement books
Grants in Aid /Loan Register
Expenditure Register.
A balance of Rs 6.50 lakhs remains un utilized.
Signature by Departmental Secretary Counter Signature by Planning Secretary
   
Name: G.P Sharma   Name:  
Date:    Date:  
Place: Gangtok, Sikkim.   Place: Gangtok, Sikkim.  
Office Seal   Office Seal